7/02/2020 Hart Road at US Route 14 Construction Update

July 2, 2020
Completed drainage structures on South Hart Road
Preparation of curb and gutter - concrete median on N. Hart Road

Grading of the aggregate road base continued this week on US Route 14 and S. Hart Road.  Storm sewer installation was completed on South Hart Road.  Next week,curb and gutter as well as the first lifts of asphalt will be placed on USRoute 14 and N. Hart Road.  Construction f the cast in place concrete headwalls for the 6’ x 4’ box culvert and large diameter elliptical pipe on Hart Road is also anticipated to begin next week.

 

Please be prepared for traffic delays next week due to theinstallation of the curb and gutter and asphalt on US Route 14 and N. Hart Road.