10/09/2020 Hart Road at US Route 14 Construction Update

October 9, 2020
Rolling of Newly Placed Asphalt on US Route 14

This week, the concrete retaining walls were stained , pavement milling was completed on both Hart Road and US Route 14 and level binder asphalt was placed on US Route 14.

 

Next week, longitudinal joint sealer will be installed on US Route 14 and Hart Road, traffic signal detector loops will be placed in the new pavement and asphalt surface material will be placed on both US Route 14 and Hart Road.