08/27/2020 Hart Road at US Route 14 Construction Update

August 27, 2020
Footing of the Headwall on the North Side of US Route 14
Concrete Pump Truck Preparing to Pour Concrete for Headwal
Concrete Pump Truck in Relation to the Footing Location

This week, construction of the footings and the headwall for the box culvert that extends under US Route 14 continued as well as placement of the last sections of box culverts that are incorporated into the headwall.

 

Next week,the headwall will be completed and work on the interior portion of the median of Hart Road will be completed.