07/31/2020 Hart Road at US Route 14 Construction Update

July 31, 2020
Curb and Gutter Formed at US Route 14 and S. Hart Road
S. Hart Road Fined Graded and Ready for Asphalt Binder

This week, curb and gutter was placed on North Hart Road and asphalt binder was placed on South Hart Road.Next week, grading and road base preparation will be occurring on South Hart Road between the railroad tracks and US Route 14 and North Hart Road.