07/10/2020 Hart Road at US Route 14 Construction Update

July 10, 2020
Preparation for the Concrete Base on US Route 14
Placement of Curb and Gutter through Driveway on US Route 14

Curb and gutter was installed on sections of US Route 14 and N. Hart Road and the concrete base was placed on US Route 14 this week.  Construction of the cast in place concrete headwalls for the 6’ x 4’ box culvert and large diameter elliptical pipe will continue  on S. Hart Road. Grading on N. Hart Road was completed in preparation for placement asphalt.  Next week, asphalt paving will be occurring on N. Hart Road and US Route 14.