06/26/2020 Hart Road at US Route 14 Construction Update

June 26, 2020
4' x 2' Box Culvert and Manhole Installation

Installation of the 4’ x 2 box culvert was completed this week on Hart Road , South of US Route 14.  Grading continued this week in the area of the US Route 14 pavement widening.  Next week,  ditching will begin on S. Hart Road, work will continue in the pavement widening areas and construction of the cast in place concrete headwalls for the 6’ x 4’ box culvert and large diameter elliptical pipe will begin on Hart Road.