The 60” elliptical storm sewer and the 5’ x 3’ box culverts were installed this week on Hart Road , South of US Route 14. Next week, the 4’ x 2’ box culvert will be installed on Hart Road, South of US Route 14 and roadway underdrains will also be installed.