The proposed improvements along Hart Road include a right turn lane and dual left turn lanes on the south approach, a left and right turn lane on the north approach, and sidewalk along Hart Road.
Improvements to US Route 14 include right turn lanes on both legs of the intersection. Proposed pedestrian enhancements include sidewalk, an 8’ multi-use path on Hart Road and US Route 14 and traffic signal enhancements to allow pedestrians to safely cross US Route 14 and the railroad tracks.
Proposed intersection improvements
The Hart Road Detour will occur approximately from June 2020 - August 2020.